Why European public bodies increasingly prefer open communications: a procurement view
Not because it is cheaper and not out of idealism, but because 'replaceable' has entered the risk model.
Read through a few European public-sector communications tenders and one change stands out: clauses about source-code availability and data residency have moved from optional to mandatory.
The driver is not saving money
Many assume the public sector chooses open source to avoid licence fees. Once migration, training and operations are included, total cost is often no lower than commercial alternatives. The real driver is the structure of risk.
- Vendor lock-in risk: once data formats and interfaces are proprietary, the cost of switching grows exponentially with time.
- Policy change risk: provider terms, pricing or an exit from a market can interrupt operations.
- Audit risk: where data flows and who can access it must be provable, not promised.
Procurement is not asking which product is nicer. It is asking whether there are still cards left to play when something goes wrong.
Open source is not automatically secure
Worth stating plainly: open source does not guarantee security. Visible code only makes audit possible. What actually determines safety is maintenance activity, vulnerability response time and the operator's own discipline. An open project untouched for three years is no safer than a closed one.
The practical selection criteria
Mature public-sector projects tend to check the same list: is there a commercial entity behind the project, is there a long-term support release, are there several integrators to choose from, is the community active, and is an exit strategy feasible — can data be exported completely, can endpoints keep working.
What it means for vendors
If you sell to customers who care about control, saying 'we are secure' achieves nothing. You need answers on whether code can be inspected, whether it can be deployed privately, whether a third party can take over maintenance, and how data is exported. Those four answers often decide the deal more than the feature list.